The floor is finished, which was a bigger project than anticipated. The concrete floor under the original carpeting was very uneven so the entire floor had to be ground down before the tile could be installed.
It is a porcelain tile floor, so it should stand up for a very long time. Because the space is long and narrow, it was hoped that creating a diagonal pattern would create the illusion of the floor being larger than it is.
The new cabinets should arrive within a week and then the Cambria design surface can be ordered.